Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon
Flexible EVA Green Resistant H75 Beacon

Flexible EVA Green Resistant H75 Beacon

302-0022VE
€53.97
Tax included

Dimensions: 730 x Ø 200 mm

Material: Elastomer with EVA rubber

Color: Green with 2 level 2 white reflective bands

Attachment with 1 supplied plug and screw

 

Also available in the following colors:

- Ref. 302-0022AM: Yellow

- Ref. 302-0022AZ: Blue

- Ref. 302-0022RO: Red

- Ref. 302-0022NE: Black

If a tool is needed for installation, use reference 990-0209.

There is also a black cap available for the beacons (Ref. 990-0040)

High-quality bollard. Performs well outdoors, in marine environments, against chemical agents, and impacts.

No maintenance required.

Its two reflective bands are Level II and make it highly visible both day and night. Resistant to being run over.

Complies with standard UNE 135-363

Very easy to install using a screw between the base of the bollard and the ground. Includes anchor and screw for ground fixation.

Made of elastomer specially stabilized to light. It has two perimeter reflective bands with their ends mechanically fixed for optimal film permanence. Its conical base, protected by an indeformable saucer, facilitates the folding of the bollard without tears or permanent deformations.

An 18 mm diameter x 160 mm deep hole made in the pavement is all that is needed for its installation, which, when done correctly, guarantees a long-lasting presence in its location, resistant to repeated impacts and run-overs.

BOllARD ASSEMBLY

1.- Make a clean hole in the pavement with a depth of NO less than 18cm, using a hammer drill and a 18mm carbide-tipped drill bit

2.- With a hammer, drive the anchor with the threaded screw inside it until the anchor is fully inserted

3.- Using a 19 mm wrench, tighten the screw until the anchor is locked (two or three turns are enough). Then, remove the screw by unscrewing it and pulling with pliers if necessary

4.- Place the screw at the end of the long wrench that will be held by the tool's magnet (supplied only upon customer request).

5.- Insert the Wrench-Screw assembly through the bollard and insert the tip to the bottom of the anchor

6.- Tighten the screw all the way

You might also like